After your pool has been replastered, we recommend brushing the pool for two weeks, twice a day if possible.
The purpose of brushing is to push the plaster residue towards the main drains to keep it from settling on the new plaster and clear the water as quickly as possible. The process is to start at the entry steps, brushing toward the main drains. It is important to brush the entire pool, including the walls.
The first step is to drain, stabilize, and acid wash the pool. Next, we chip around the fittings and light niches as well as any hollow areas of plaster that need to be removed. We then apply a resin-based Bond Kote, which is much like taking the pool back to gunite for the new plaster to adhere. This part of the process takes one day.
On the second day, we apply the plaster and begin filling the pool. This process is usually started very early in the morning and completed in the afternoon. We put the hose in the pool and begin filling it.
There are several benefits when choosing an upgraded plaster, both functional and aesthetic. Any of the upgraded products come with a 10-year manufacturer warranty. They are more resilient to staining or discoloration, not to mention that they allow you to achieve many different effects in watercolor. Would you like your pool to look like the Caribbean Sea or the Pacific Ocean? Maybe you like a sandy beach effect or a natural lagoon-type look.
Chemistry is crucial to maintaining the plaster. Filtration and proper chemistry are imperative to the longevity of plaster, whether it is white plaster or an upgraded plaster. We recommend taking a water sample to your local pool supply company once a week and having the chemistry tested, especially in the heat of the summer. As the water has natural evaporation, there is also a loss of chemicals when refilling the pool due to evaporation.
Depending on how extensive the remodel is, in most cases, it will take no more than a week from start to finish.
It is a misconception that quartz or pebble surfaces are rough surfaces. If the application is done properly, they are not rough.
If you are doing just a replaster for pool only or pool and spa, the process generally takes two days.
We recommend a minimum of two weeks.
Yes, there are many different options. You can choose a quartz finish, a pebble finish, or a polished marble Hydrazo finish.
For more information about pool plastering and other pool renovation services, call 281-345-0200.